AMAGE solutions participated in the implementation of the project titled: "Digitization of the production process in construction - Polish BIM Center." It focuses mainly on preparing and providing entrepreneurs in the construction industry with tools that allow them to efficiently and effectively support the process of digitization of the company's activities. One of the elements of the project was the implementation of a new building using BIM technology. The project was implemented by the Polish Construction Cluster - National Key Cluster.
The implementation challenge was to propose AMAGE tools throughout the entire building development cycle along with full cooperation with CAD/CAM design systems and CDE project documentation management environments as part of the developed BIM implementation plan. The cycle in which AMAGE software participated included the design stage, the construction stage and the building operation stage.
The building constructed as part of the above-mentioned project is located in Białystok at 11A Pułkowa Street. The project was implemented by a team of architects and a team of contractors. Separate dedicated teams were responsible for coordinating and supporting the project in accordance with the BIM methodology. The Catenda HUB solution (previously called BIM Sync) was chosen as the CDE technology. A diverse set of CAD/CAM software from the Autodesk and Graphisoft families was used for design.
As part of the construction project, AMAGE was to provide software supporting the entire project in the area of ​​project and task management, as well as introducing additional functions related to assembly supervision, inspection work and fault coordination. During the implementation of the construction project, a set of data was to be created in parallel and verified on an ongoing basis, which would then be used in an instance of the AMAGE system dedicated to facility management. Both the native transfer of IFC models and the transitional model in the COBie format were used to transfer data between the construction instance and the property management instance. At the same time, technical and operational documentation of the devices developed during construction was imported/transferred.
In effect:
A complete, comprehensive and scalable solution supporting the entire construction and operation process.
Support during the construction of contractor and investor teams.
Full integration (at the IT/API level) with the CDE environment and seamless data exchange between systems. This facilitates data transfer and avoids costly data migrations and human errors.
During the construction process, the investor has insight into the tasks, components and activities performed on one platform.
Seamless data transfer between construction data and the property management system (FM)
The FM system is ready for operation from the moment the construction is handed over to the investor. This drastically reduces the time needed to start the system and transfer data to it.
Based on BIM standards and data schemas developed there, it facilitates coordination between teams and data exchange.
AMAGE system solutions complement construction and operation in accordance with the BIM process with additional tools and functions that seamlessly integrate with the entire process.
A ready-made FM system with data obtained during construction, with full identification of key rooms and devices and coordination with the 3D model of the investment.