The Thermal Waste Transformation Plant in Cracow (Eco-incineration plant) was built as a response to Cracow's ecological needs. The plant is located in the south-eastern part of the city of Cracow, in Nowa Huta, at Jerzego Giedroycia Street 23. The plant can process 220 thousand. tons of municipal waste.
The task of the AMAGE system is to support decision-makers in the field of environmental protection. Supports the supervision of ecological aspects related to the parameters of the Integrated Permit, including all information on contracts, formal requirements and required control works and the obligation to report to external local government / government units.
Â